In Progress: Bukit Tua Oil/Gas Redevelopment

PT Gearindo Prakarsa is currently working on a major project for PC Ketapang II Ltd. at the BTJT-B, Bukit Tua Field in East Java, Indonesia.

worldwide reach

Our Work Process

This work order, dated April 2025, covers the “Provision of Procurement, Construction and Commissioning (PCC) for Bukit Tua Oil/Gas Redev Phase 4 Project”. Our scope of work includes:

1

Minor Engineering:

We are providing minor engineering services based on the detailed design documents and drawings of the flowline system.

2

Procurement:

We are procuring all necessary materials, including piping, electrical, and instrumentation components, as well as providing vendor assistance for company-supplied items.

3

Pre-fabrication:

We are handling pre-fabrication for piping flowlines and gas lift lines, which includes non-destructive examination (NDE), hydrotesting, heat treatment (PWHT), and painting.

4

Offshore Activities:

Our team is conducting a variety of offshore tasks, such as site verification, installation of a Wellhead Control Module (WHCP), modification of Chemical Injection (CI) systems, and installation of heat tracing. We are also performing piping tie-ins, installing field instrumentation, and managing electrical and instrument cabling.

5

Commissioning and Logistics:

We will be responsible for offshore hook-up, pre-commissioning, and commissioning of all systems. Additionally, we are providing logistics for offshore materials, including certified containers for tools and equipment.

Teamwork Sep 2025 - 15
Teamwork Sep 2025 - 15

We are committed to completing this project safely and successfully for our client.