Premier Oil BCP
PT Gearindo Prakarsa has successfully supported the Premier Oil BCP (Barge Campaign Project) in 2021. This extensive job included the major maintenance on Anoa /AGX Platform and Gajah Baru offshore platforms in the Natuna Sea.

Pandemic Year
This is a challenging job because it is conducted during the pandemic year and each personnel involved has to be fully in compliance with the health protocol of Covid-19 and Safety requirement as per Premier Oil regulations.
Challenging project
There were more than 200 employees involded in the project. This is really a challenging project since mobilization of the employees, materials supplies, hundreds of structures for fabrication, and various tools & equipments including engine equipments had to be conducted in one time within less than 1 month from the date of the kick off meeting.
latest training news
Placerat duis ultricies lacus sed turpis tincidunt id aliquet risus

Management visit in the work location in the platform – Project BCP Prenier Oil Natuna Sea 2021

Project BCP 2021 – Premier Oil - PTW (Permit To Work) Training

Project BCP 2021 – Premier Oil TBT (Tool Box Talk) Morning

Tool Box Talk - Safety Briefing

Uninstall Gangway

Installing Gangway

Installing Gangway

Installing Gangway

Project BCP 2021 – Premier Oil (Welding Activity Inside Pressurized Welding Habitat)

Project BCP 2021 – Premier Oil (Piping Spool Installation)

Project BCP 2021 – Premier Oil (Chipping & Painting Process)

Project BCP 2021 – Premier Oil (Chipping & Painting Process)

Project BCP 2021 – Premier Oil (Rigging, Lifting, and Installation Extension Deck)

Project BCP 2021 – Premier Oil (Rigging, Lifting, and Installation Extension Deck)

Project BCP 2021 – Premier Oil (Overboard Scaffolding Installation)

Project BCP 2021 – Premier Oil (Overboard Scaffolding Installation)

Project BCP 2021 – Premier Oil Chiping and Painting with RAT (Rope Access Technician)

Chipping Process

All tools and equipments have to be ready for use, therefore checking and preventive maintenance have to be conducted routinely.

Project BCP 2021 – Premier Oil (Rigging, Lifting, and Installation Extension)

Project BCP 2021 – Premier Oil (Rigging, Lifting, and Installation Extension)

Project BCP 2021 – Premier Oil (Regular Meeting With The Client)

Project BCP 2021 – Premier Oil (Senam Pagi)

Project BCP 2021 – Premier Oil (Shalat Idul Fitri 1442 H)